• +31 (0)88 998 44 00
  • Stories
  • Careers
  • Contact us
EN - Global
Kiwa logo Kiwa home
  • Services
    • Testing
    • Inspection
    • Certification
    • Consultancy
    • Training
    • Digital Solutions
    • Calibration
    • Explore services
  • Markets
    • All markets
    • Automotive and Aviation
    • Construction and Infrastructure
    • Consumer Products
    • Cyber Security
    • Education and Training
    • Energy and Power Generation
    • Fire, Safety and Security
    • Food, Feed & Farm
    • Hazardous Materials
    • Industry Assets
    • Management Systems
    • Medical Devices
    • Mining
    • Oil, Gas and Chemicals
    • Process Industry
    • Radio, Wireless and Electrical Equipment
    • Real Estate Services
    • Sustainable Solutions
    • Tourism and Leisure
    • Transport and Mobility
    • Utilities
    • Water
  • Themes
    • All themes
    • ISO 27001 standard for information security
    • ISO 9001 Quality Management System
    • Remote auditing
    • FSSC 22000 food safety management system
    • Recycling
    • Supporting organizations through COVID-19
  • About Kiwa
    • About us
    • Accreditations and Notifications
    • Careers
    • Corporate Social Responsiblity
    • Head office locations
    • Key figures
    • Kiwa Code of Conduct and Compliance
    • Kiwa is member of the TIC-Council
    • Management
    • Mission and vision
    • Part of SHV
    • Quality labels
    • Terms, conditions and regulations
    • The Kiwa beaver
  • Stories
  • Careers
  • Contact us
  • EN - Global
    • Australia
      Australia English
    • Belgium
      Belgium Nederlands Français
    • China
      China 中文
    • Denmark
      Denmark Dansk
    • Estonia
      Estonia Eesti keel
    • Finland
      Finland Suomi
    • France
      France Français
    • Germany
      Germany Deutsch English
    • Italy
      Italy Italiano English
    • Korea
      Korea 한국어 English
    • Latin America
      Latin America Español
    • Lithuania
      Lithuania Lietuviškai
    • Latvia
      Latvia Latviešu Pусский
    • Luxembourg
      Luxembourg Français
    • The Netherlands
      The Netherlands Nederlands English
    • Norway
      Norway Norsk
    • Poland
      Poland Polski
    • Portugal
      Portugal Português
    • Spain
      Spain Español
    • Sweden
      Sweden Svenska
    • Turkey
      Turkey Türkçe English
    • United States
      United States English
    • United Kingdom
      United Kingdom English
  • Services
  • Markets
  • Themes
  • About Kiwa
Contact us
Services

  • Testing
  • Inspection
  • Certification
  • Consultancy
  • Training
  • Digital Solutions
  • Calibration
  • Explore services
Markets

  • All markets
  • Automotive and Aviation
  • Construction and Infrastructure
  • Consumer Products
  • Cyber Security
  • Education and Training
  • Energy and Power Generation
  • Fire, Safety and Security
  • Food, Feed & Farm
  • Hazardous Materials
  • Industry Assets
  • Management Systems
  • Medical Devices
  • Mining
  • Oil, Gas and Chemicals
  • Process Industry
  • Radio, Wireless and Electrical Equipment
  • Real Estate Services
  • Sustainable Solutions
  • Tourism and Leisure
  • Transport and Mobility
  • Utilities
  • Water
Themes

  • All themes
  • ISO 27001 standard for information security
  • ISO 9001 Quality Management System
  • Remote auditing
  • FSSC 22000 food safety management system
  • Recycling
  • Supporting organizations through COVID-19
About Kiwa

  • About us
  • Accreditations and Notifications
  • Careers
  • Corporate Social Responsiblity
  • Head office locations
  • Key figures
  • Kiwa Code of Conduct and Compliance
  • Kiwa is member of the TIC-Council
  • Management
  • Mission and vision
  • Part of SHV
  • Quality labels
  • Terms, conditions and regulations
  • The Kiwa beaver
  1. Service
  2. Consultancy
  3. Boiler room under ground level

Boiler room under ground level

Certification of a boiler room under ground level is intended to reduce the probability of a gas explosion in the boiler room to a significant extent. This is achieved by implementing additional measures.

Give us a call
+31 (0)88 998 44 00
Not ready for a quote?
Let's get in contact

This means that a certified boiler room can be accepted by a municipality as offering the level of safety required by the 2012 Dutch Buildings Decree (Bouwbesluit 2012).

Municipalities, Installation companies, Housing Associations, Building Owners, Firms of Consulting Engineers

Based on current legislation and regulations, allowance must be made for the possibility of a gas explosion in a room which contains one or more gas-fired appliances. The room must be constructed in such a way that there is no risk of collapse of (parts of) the building if a gas explosion takes place. This means that the wall design for boiler rooms must include some form of pressure relief (break-away/blow-out wall). As break-away/blow-out wall cannot be engineered in the case of boiler rooms inside the building and particularly in the case of boiler rooms under ground level, it is impossible to situate a boiler room at this location. As a result, boiler rooms under ground level are hardly ever found in new construction situations. In existing situations however, boiler rooms under ground level are frequently encountered. If changes are made to the existing situation, for example renovation work or a building extension, or when the existing heating system is replaced, the issue of the boiler room's location becomes a potential problem. Moving an existing boiler room in order to comply with regulations is always associated with disproportionately high costs as the infrastructure for the systems also has to be changed extensively. Sometimes even, relocation is technically impossible. These circumstances sometimes result in no changes being made to an existing situation, even if the heating system has reached the end of its technical life, thereby explicitly leading to potential risk in terms of reliability and safety. Kiwa visits the site in order to identify specific points requiring attention, assesses the design that is subsequently submitted and, after completion of the changes to the boiler room, determines whether the new situation complies with the requirements set by Kiwa. If the boiler room is approved, Kiwa issues an approval certificate. This certificate is proof of equivalence with the stipulations of the Dutch Buildings Decree (Bouwbesluit).

If the municipality agrees with the principle of viewing these additional facilities as an equivalent solution for the relevant requirements in the Dutch Buildings Decree (Bouwbesluit), the designer must submit an adequately detailed plan to Kiwa Technology for assessment. Kiwa Technology assesses this plan and issues instructions on implementation, depending on the specific situation. A written report on the subject is sent to the client. This report can be used subsequently as part of the application for a building permit. After completion of the works, Kiwa Technology visits the site to assess the situation in terms of the technical facilities that have been installed and the procedures that have been drawn up for the usage phase.

An assessment is also made of whether the situation complies adequately with the current equipment requirements for boiler rooms (NEN 3028). If the work has been carried out in accordance with this standard and the additional criteria referred to above,

Kiwa Technology issues a statement of conformity.

Dutch Buildings Decree (Bouwbesluit)

The relevant requirement in the Dutch Buildings Decree (Bouwbesluit) is based on the assumption that a boiler room presents a real threat of gas explosion. (Furthermore, this requirement also applies to other rooms that contain a gas appliance, i.e. a kitchen inside a home). A gas explosion may not damage the main load-bearing structure of the building. If a break-away/blow-out wall (or explosion hatch) cannot be installed, there is a risk of damage to the main load-bearing structure. A structural engineer can calculate whether or not the main load-bearing structure will in fact be damaged (based on NEN 6702).

In situations where no pressure relief arrangement (break-away/blow-out wall) is possible and the calculations indicate that the main load-bearing structure will be damaged in the event of an explosion, other methods must be used in order to achieve compliance with the legislation. This can be achieved for example by installing suitable additional facilities in the boiler room. This reduces the likelihood of a destructive explosion to such an extent that measures designed to limit the consequences of an explosion (break-away/blow-out wall) are no longer meaningful.

Related Products

  • Getting a grip on gas
  • Industrial Gas Systems
creating trust, driving progress

We are Kiwa. With our certification, inspection, testing, training and consultancy services, we create trust in our customers' products, services, processes, (management) systems and employees.

Services
  • Testing
  • Inspection
  • Certification
  • Training
  • Consultancy
Contact us
  • Send us your message

Follow us:

  •  
  •  
  •  
  •  
  • Disclaimer
  • Cookie policy
  • Responsible disclosure policy
  • Beware of fake Kiwa certificates in China
  • Privacy Policy